The West Wing

A little more space required…

Preparing the ground (June 17th 2021)…

Bringing in the stones (June 22nd 2021)…

Making the base (June 23rd to 27th 2021)…

Ready for the Cellglas to be laid (June 28th and 29th 2021)…

Building starts on the storage room at the back (August 12th 2021)…