4th – 27th October

4th October
5th October
6th October
6th October
6th October
6th October

9th October
9th October entrance hall
9th October
11th October
13th October -East preview of roof terrace
13th October – South East preview of roof terrace
13th October – South preview of roof terrace
13th October – South West preview of roof terrace
14th October – threading the cables
14th October – cables threaded
14th October – Gips/plasterboard
22nd October – windows installed
22nd October – from the outside
22nd October – attractive entrance
26th October – ceiling
26th October
27th October – sliding door
27th October – windows uncovered
27th October – from the side road
27th October – windows cut out